Loading…
Loading…
148 results • Recent activity
Consultancy services for Independent Engineer for Construction of 4Lane Access controlled Highway from Vakalapudi Light House to Annavaram (on NH16) section of NH-516F from Km. 0.000 to Km. 40.621 on HAM under BMP, Phase1 in Andhra Pradesh.
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km on NH27 in the state of Gujarat
Cons. of Long-Term Remedial mea. River cut/bank erosion at identified 19 locations (i.e. ARC-16 ARC-46 RC-28 RC-29 ARC-36 ARC-37 ARC-38 ARC-39 ARC-31 ARC-32 ARC-33 ARC-34 ARC-35 RC-16 ARC-17 ARC-18 RC-26 ARC-29 ARC-30) KULLU TO MANALI NH-03 in HP
Upgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
Rehabilitation and strengthening along with integrated routine maintenance incl. IM of 4 n 6 laning of Delhi Haryana Border to Rohtak sec of NH9 Km29.650 to Km93.140 include Bahadurgarh n Rohtak Bypasses in Haryana on Item Rate Percentage basis