Loading…
Loading…
159 results • Latest
Inventorisation and Condition Survey of selected National Highway stretches through Network survey vehicle (Phase III)
Improvement and Rectification Works at 5 Nos. of MoRTH-identified Black Spot Locations through long term measures on Lucknow Kanpur Section of Old NH-25 (New NH-27) (Km 27.700 to Km 75.500) in the State of Uttar Pradesh.
Consultancy services for Authority Engineer for Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch.61.878 and 63.845 on NH-44 for Jamb Junction in the State of Maharashtra on EPC mode
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
CS for AE for Supervision of Const of New Slip Service road on either side at various locations L25.140 Km Flyover at Borivali Junc Km.528.550 at Sherekarpada Km.528.800 on Pimpri Sado Vadape sec of NH848 Km.460.900 to Km.537.000 in MH on EPC mode
CS for AE for Supervision of Cons.of new Slip/Service road on at various locations (TL 30.28 km (LHS.RHS) and Flyover (2x30m) at Sawadgaon Phata (310.380) on Dhule-Pimpalgaon sec. of NH-60 from 261.720 to Km. 380.000 in Maharashtra on EPC NH(O)
CS for preparation of DPR and Feasibility report for cons. of 4L tunnel and viaduct (205.26 to km 207.25 TL of tunnel 1.67 km and viaduct 320m) on NH33 and 4L spur connection from IWAI Sahibganj port to NH33(TL 2.8 including 1 ROB) in Jharkhand
Appointment of safety consultant for streches under development/construction in the state of Andhra Pradesh for pkg-IV
Construction of Temporary Toll Plaza at Km.1378.800 on Nellore Bypass section of NH-16 7th call
IE Services during Operation and Maintenance Period for Tada Nellore section of NH-16 from Km.52.800 to Km.163.600 and Nandigama - Ibrahimpatnam - Vijayawada section of NH-65 on BOT(Toll) and Nellore Bypass section of NH-16 (Total length 176 km)