Loading…
Loading…
149 results • Recent activity
Operation and Maintenance of 4/6 laning of Aurangabad (km 290.200) to Karodi (km 320.640) and Karodi (km 320.640) to Telwadi (km 375.000) section of NH52 in Maharashtra for 5 years on Performance Based Maintenance Contract (PBMC) mode.
Independent Engineer Services for Construction of new four-lane Access controlled Highway from Cuttack (end point of CRRR at NH-16 near Tangi) to Kandarpur on SH-12 from Design Ch. 0.000 km to 21.225 under NH(O) on HAM in the state of Odisha
Construction of 4L of Patna Arrah Sasaram corridor PKG2 Sec 1 Garhani at Ch. Km 73.700 Patar at Ch. Km 84.300 and Sec 2 Greenfield from Sadisopur at Patna Ring Rd NH131G) Ch. Km 0.000 to Asani (at NH319) at Ch Km 35.800 of NH119A in Bihar on HAM Mode
Consultancy Services for Design Build and Management of Digital Highway Monitoring System (DHMS)
Construction of 4 laning of Sahebganj Areraj Bettiah of NH 139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode comprising (i) Section 1 Sahebganj to Areraj (38.362 km) and (ii) Section 2 Areraj to Bettiah (40.580 km)
Construction of Bypass to Gangaikonda Cholapuram in Kallagam to Meensurutti section of NH-81 (Old NH-227) in Tamil Nadu on EPC Mode