Loading…
Loading…
149 results • Recent activity
Construction of 2-lane with Paved Shoulder Greenfield Bypass for Lalganj Ajhara-Mohanganj and Raniganj on Raebareli-Jaunpur Section (Design Km 0.000 to 53.177) of NH 31 in the state of Uttar Pradesh on Hybrid Annuity Mode
Operation n Maintenance of 4 lanes with Paved Shoulders of Lambra Shahkot Moga section of NH71 (New NH703) from Km 12.120 to Km 77.200 (Length 65.080 Km) in Punjab for 5 years on Performance Based Maintenance Contract (PBMC) mode
Operation and Maintenance of Four lane with Paved Shoulders of Bathinda-Tapa-Sangrur section of NH-07 from Km.123.542 to Km.220.265 in the State of Punjab in the state of Punjab on Performance Based Maintenance Contract (PBMC) mode
Construction of Underpass on NH-31 (old NH-56) for proposed Expansion of Runway of Lal Bahadur Shastri International Airport at Varanasi in the state of Uttar Pradesh on deposit basis
Construction of service road on both side of 4-lane Varanasi bypass from Km 0.00 (starting point at Km 271.300 of NH-56) to Km 15.250 (end point at Km 11.170 of NH-29) in the state of Uttar Pradesh on EPC mode
Anchoring and Facing Stones repair including fixing Stainless Steel/Carbon Steel/Galvanized Iron anchors dry stone cladding adjustable cramps at South and West Faces of NHAI HQ New Building G3 Sector 10 Dwarka New Delhi 110075