Loading…
Loading…
163 results • Latest
IE Services for AC Highway of 4Lane with Paved Shoulders from Walajapet Ranipet to TN AP Border of NH40 in TN on HAM under NH(O) (Project L28.021 Km)-(3rd Call)
Operation and Maintenance work of Two Laning with paved shoulder of Bihar Sharif Barbigha Mokama section of NH 33 (old NH 82) from Km 94.478 to Km 149.053 in the state of Bihar on PBMC mode
IE Services for 4 laning of NH167 from Gudebellur at Design Km.182.930 to Mahabubnagar at Design Km 262.940 of Hyderabad Panaji section (Length 80.01km) under NH(O) on (HAM) in the state of Telangana.
IE for Construction of 6 lane Zirakpur Bypass (Starting from Junction with NH7 (Zirakpur Patiala) (DC 0.000) and ending at Junction with NH5 (Zirakpur Parwanoo) (DC 16.800) (Total Length 19.200 Km) in Punjab and Haryana under NH(O) on HAM
IE services for up-graD of ex 2L to 4L with paved shoulder from Deshgaon to Julwaniya sec of NH347B km 0.000 (Ex km99.924 on NH347BG)to km 108.643(Ex km129.900 on NH52) under NH(O) in MP on HAM
CS for preparation of DPR for develop. of 6 lane GF highway from Ahmedabad to Godhra Tentative L 120 Km to connect Ahmedabad with Delhi Mumbai Expressway (DME)
Emergent and Special Work of Dhaula Kuan section of NH-48 and Other Works along the Project Highway from Km. 11.000 to Km. 13.940 (Dhaula Kuan in Delhi to RTR Flyover) of Six Month (6month) on Item Rate basis
Improvement of Main Carriageway and Service Rd with overlay of DBM/BC PQC in water prone areas and other associated works including routine maintenance and integrated incident mgmt on NH 44 Phagwara Jalandhar sec 352.730 to 387.100 on Item Rate perc
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Maintenance of Plantation on Amritsar to Wagah Border section of NH-03 including Phulkari Garden for a period of 2 years