Loading…
Loading…
163 results • Latest
CS-AE for Upgradation with Rigid Pavement of Existing 2-Lane Carriageway to 2-Lane Carriageway with Paved Shoulder from Ch.665.686 (Km.665.686) in Khanpur Village to Ch.710.470 (Km.710.483) in Karvad Village (TL 44.784 Km) of NH-56 in Gujarat on EPC
Construction of 4-lane Thiruvarur Bypass (Km 15.900 Km 30.836) in Nagapattinam Thanjavur Section of NH83 in Tamil Nadu on Hybrid Annuity Mode (Project Length 14.936 km)
IE services for Construction of 4 L of Badnawar Petlawad Thandla Timarwani section of (NH 752D) from Badnawar Bypass Ch. 70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE 4) Ch. 150.850 in Madhya Pradesh on HAM under NH(O)
Construction of 3 nos. of VUPs at Ayodhya Bypass from km.1353.120 to km.137.060 (Design Length- 1.940 km) of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode in Uttar Pradesh. (2nd Call)
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar L-9.98Km
Const of Gr Separated Structure at 24.907 Abhava Jn 25.720 Mindhola Jn 27.121 Khajod Jn include RE Walls Service Rd and Drains along with missing Service Rd and conversion of Earthen Shoulder to PS on Hazira Port Surat GJ/MH Border of NH53 in GJ on E
Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO
Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM
Independent Engineer Services for Construction of 4 laning of Sahebganj Areraj Bettiah of NH-139W Total length 78.942 km in Bihar on HAM comprising i Section 1 Sahebganj to Areraj 38.362 km and ii Section 2 Areraj to bettiah 40.58 km.
RFP for IE Services during O n M period of TOM n Transfer of Muzaffarnagar to Haridwar sec from Km 130.560 to Km 209.120 of old NH 58 New NH334 in Uttar Pradesh and Uttarakhand