Loading…
Loading…
1,902 results • Recent activity
Supply of couplings for Vacuum Pumps(Model:SHR21850)
Service Charges towards Deputation of Engineer for Testing, Tuning and Trouble shooting of Unit 9 and 10 DAVRs and its PSS in KTPS V Stage
BTPS - CHP - Periodical maintenance of diversion plates, scrappers and skirt rubber for the conveyors BCN- 4A/B, 5A/B, 6A/B, 7A/B, BCN - 10 and Trippers as and when required in MM-III subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Erection of rubber bellows for ring granulators, Fabrication and Replacement of chute liner plates, Chute patch welding at coal hitting areas for all chutes and greasing to all bearings, scoop couplings, geared couplings, gear boxes, Carden shafts belongs to crusher, VGF, BF and Flap gates in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Replacement of new/reconditioned flap gates, diversion plates, actuators, guide pipes, counter weight structer, oil top up and greasing, belt sway, etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyor BCN-1A/1B, BCN-2A/2B, BCN-3A/B and ILMS 1 and 2 and contingency reclaim belt conveyors -1 and 2 from 01.04.2026 or actual date of commencement of work to 31.03.2027 required in MM-I sub division of MM/CHP/BTPS.
Supply of Masibus make Water Flow Indicator Totaliser,Masibus make Water Flow Indicator and Pressure Gauges at SLBHES, Srisailam Dam West.