Loading…
Loading…
1,902 results • Recent activity
Smart positioners for Pneumatic actuators and Dampers
TGGENCO- YTPS(5X800MW) - Stage-I-Maintenance Works of Unit-1 LT switch gear of LT-1 sub division of Stage-I/YTPS(5X800MW) as and when required for the FY:2026-2027 from 01.04.2026 or actual date of commencement of work to 31.03.2027
TGGENCO-YTPS(5X800MW)-SY TY-Tightening of clamps and connectors in 400kV switchyard from power transformers bushing, Bus Reactors and Repair and Alignment of Isolators and Earth Switches and Replacement of CT/CVT/CBs as and when required in YTPS plant during the FY 2026-27
TGGENCO YTPS 5x800 MW Providing 1 No AC Bolero Jeep with a mileage of 9000km per month and utilization time of 24hrs day on hire basis for official use of shift engineers to monitor inspection trouble shoot of various equipment present in CHP and maintenance engineers to attend emergency works of CHP round the clock at YTPS, Veerlapalem V, Dameracherla M, Nalgonda District from the period 01 04 2026 or actual utilization to 31 03 2027
Supply of Couplings and Spiders for Turbine Maintenance Division
Supply of Spares for H.P Bypass Valves and Spray Valves for COH 2026-27.