TGGENCO BTPS Chemical Division II Mixing of Chemicals at Stage II Cooling water Treatment Dosing of Sulphuric acid and Chlorination at Stage II cooling Tower area as when and wherever required for the period from 01.04.2026 to 31.03.2027
Excavation and Transportation of stagnated coal from Uncrushed Coal Yard (back side) , Old stacker (Road side )and yard surroundings to the grid for maintaining the bunker levels of units 9,10 and 11 of KTPS-V and VI Stages, with a lead of 1 KM.
Providing of Hire Lorry of 17Ton capacity from 08.00 Hrs to 20.00 Hrs along with licensed driver and cleaner for transportation of materials from other power stations, Suppliers Stock Yard to KTPP Stores and from KTPP to other power stations, suppliers stock yard for the period from 01.04.2026 or from the actual date of utilization to 31.03.2027.
TGGENCO BTPS Chemical Division-II - Preparation of coal samples as per IS method ie crushing coning and quartering process of entire four to five coal samples (preparation of 12.5mm samples 3.35mm samples 212 micron samples and drying of coal samples) at unloaded end for the FY 2026-27 from 01.04.2026 to 31.03.2027
TGGENCO BTPS Chemical Division II Mixing of Alum and Poly Electrolyte at Ash Plant Clarifier (Auxiliary Clarifier Stage-II) as when and wherever required for the period from 01.04.2026 to 31.03.2027