Loading…
Loading…
1,920 results • Recent activity
BTPS - CHP - Regular and preventive maintenance for vibrating grizzly feeders-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Regular and preventive periodical maintenance for ring granulators-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Maintenance of conveyor equipment viz pulleys, bearings/sleeves of pulleys, realignment and Geared coupling, periodical and breakdown works as and when required for the conveyors-BCN-1A/1B, 2A/2B, 3A/3B, reclaim belt conveyors-1 and 2, ILMS and flap gates required in MM-I subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Supply of Spares for Ash water recovery pumps of CAM/Stage-II/BTPS
Supply of Chlorine leak Detector with sensors and Electrolyte solution for Chlorine leak Detector system at Chlorination Plant pertaining to I and C Division/Stage-II /BTPS
Supply of cartridge assembly for HFO pump in Boiler maintenance