Loading…
Loading…
1,920 results • Recent activity
TGGENCO KTPP CHP MM Calibration of 05nos 100MT weighbridges at KTPP Chelpur for the period from 01.04.2026 to 31.03.2027.
BTPS - CHP - Machining hours and repair of damaged rollers for BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, Tripper and ILMS in MM-III sub division of CHP/BTPS as and when required for the period from 01.04.2026 or from actual date of commencement to 31.03.2027
BTPS - CHP - Periodical and breakdown maintenance for apron feeders chain required in MM-I sub division of MM/CHP/BTPS from 01.04.2026 or the actual date of commencement of work to 31.03.2027
BTPS - CHP - Overhauling of sump pumps, cleaning of sump pits and replacement of damaged/adjustment of flexible discharge pipes and maintenance of DFDS water sprinkling systems for the conveyors BCN 1A/1B, 2A/2B and BCN- 3A/3B and contingency-1 and 2 equipment in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027 as and when required.
BTPS-CHP-Regular and preventive periodical maintenance of ventilation systems in TH, WT, BCN-1A/1B, 2A/2B and BCN-3A/3B in MM-I sub division of CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Clearing of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.04.2026 or from actual date of commencement of work