Loading…
Loading…
1,920 results • Recent activity
BTPS-CHP-Cold vulcanization belt joints, pulley lagging for the 1400mm BW conveyors, BCN-4A/B, BCN-5A/B,BCN-6A/B, 7A/B and BCN-10 of conveyors as and when required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Cold and hot vulcanization belt joints for the 1400mm BW conveyors BCN-8, BCN-9 and Stacker cum reclaimer-1 and 2 conveyors in MM-IV Sub Division of MM/CHP/BTPS for FY 2026-27 as and when required for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Periodical and breakdown maintenance of ground reclaim feeder equipment of contingency-1 and 2 as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027
BTPS - CHP - Machining Works required for BCN-1AB, 2AB, BCN- 3A/3B, Paddle feeders-1,2,3 and 4, Apron feeders-1 and Contingency - 1 and 2 equipment sump pumps, ventilation systems and miscellaneous works as and when required in MM-I Sub Division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of the work to 31.03.2027
BTPS - CHP - Periodical and breakdown maintenance of belt conveyors, replacement of new/reconditioned rollers and frames for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B and tripper, as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Repair of discharge chutes of BCN-4A/B, 5A/B, 6A/B, 7A/B, at TP-3, TP-4, TP-5 and tripper by fabrication and erection of MS plates, SS liner plates to the hitting areas of discharge chutes as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027