Loading
Loading…
Loading…
1,898 results • Recent activity
Supply of Spares for Ash water recovery pumps of CAM/Stage-II/BTPS
Supply of Chlorine leak Detector with sensors and Electrolyte solution for Chlorine leak Detector system at Chlorination Plant pertaining to I and C Division/Stage-II /BTPS
Supply of cartridge assembly for HFO pump in Boiler maintenance
Supply of MS Galvanized grills
Supply of Turbidity Meter
Providing of 1 No. A/C Sedan Car along with driver on hire basis including on all holidays for the use of the Chief Engineer/ OnM/KTPP for the period from 01.04.2026 or from actual date of utilization to 31.03.2027.