Loading…
Loading…
1,898 results • Recent activity
BTPS - CHP - Overhauling of sump pumps, cleaning of sump pits and replacement of damaged/adjustment of flexible discharge pipes and maintenance of DFDS water sprinkling systems for the conveyors BCN 1A/1B, 2A/2B and BCN- 3A/3B and contingency-1 and 2 equipment in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027 as and when required.
BTPS-CHP-Regular and preventive periodical maintenance of ventilation systems in TH, WT, BCN-1A/1B, 2A/2B and BCN-3A/3B in MM-I sub division of CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Clearing of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.04.2026 or from actual date of commencement of work
BTPS-CHP-Cold vulcanization belt joints, pulley lagging for the 1400mm BW conveyors, BCN-4A/B, BCN-5A/B,BCN-6A/B, 7A/B and BCN-10 of conveyors as and when required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Cold and hot vulcanization belt joints for the 1400mm BW conveyors BCN-8, BCN-9 and Stacker cum reclaimer-1 and 2 conveyors in MM-IV Sub Division of MM/CHP/BTPS for FY 2026-27 as and when required for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Periodical and breakdown maintenance of ground reclaim feeder equipment of contingency-1 and 2 as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027