Loading…
Loading…
1,898 results • Recent activity
BTPS - CHP - Machining Works required for BCN-1AB, 2AB, BCN- 3A/3B, Paddle feeders-1,2,3 and 4, Apron feeders-1 and Contingency - 1 and 2 equipment sump pumps, ventilation systems and miscellaneous works as and when required in MM-I Sub Division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of the work to 31.03.2027
BTPS - CHP - Periodical and breakdown maintenance of belt conveyors, replacement of new/reconditioned rollers and frames for the conveyors BCN-10, 4A/B, 5A/B, 6A/B, 7A/B and tripper, as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Repair of discharge chutes of BCN-4A/B, 5A/B, 6A/B, 7A/B, at TP-3, TP-4, TP-5 and tripper by fabrication and erection of MS plates, SS liner plates to the hitting areas of discharge chutes as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS - CHP - Regular and preventive maintenance for vibrating grizzly feeders-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Regular and preventive periodical maintenance for ring granulators-1,2,3 and 4 as and when required in MM-II Sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Maintenance of conveyor equipment viz pulleys, bearings/sleeves of pulleys, realignment and Geared coupling, periodical and breakdown works as and when required for the conveyors-BCN-1A/1B, 2A/2B, 3A/3B, reclaim belt conveyors-1 and 2, ILMS and flap gates required in MM-I subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.