Loading…
Loading…
840 results • Latest
Universal joint, Servo valves, Steering clutch and brake Assemblies for BD155 and BD355 Dozers
cartridge for HFO Pumps for in Fuel oil pump house stage-I
Bearings for stage-I Pumps at Kataram booster pump house
Supply of Boiler Tubes for attending tube leak breakdown works for Stage-I and II/BTPS
TGGENCO KTPP Civil PHD Stage I Dozing the Soil, clearing the jungle including uprooting unwanted wild vegetation, grass, bushes, shrubs in unwanted areas using blade Tractor and Excavator in the Plant premises area from 01.04.2026 to 31.03.2027.
KTPS VI Stage EM MRT Annual repair Charges of MEKASTAR MAKE Rack and Pinion type CHIMNEY ELELVATOR OF UNIT 11 for the year 2026 2027
TGGENCO-YTPS (5X800 MW)-BOP-II-Testing, Calibration, Servicing of Pneumatic and Hydraulic actuators, MOVs and other C and I instrumentation in CPU Regeneration and Clarifier water pump house of Yadadri Thermal Power Station of Stage-I, Veerlapalem for the period of 01.04.2026 to 31.03.2027 or from the date of commencement of work to 31.03.2027 for F.Y.2026-27.
TGGENCO-YTPS (5X800 MW)-BOP-II-Testing, Calibration, Cleaning and Servicing of Cand I instruments such as Motor operated Valves, Solenoid operated valves, Pressure Transmitters, Level Transmitters,turbidity sensors, RTDs, Vibrartion sensors and flow transmitters, HMI, OWS, LVS, EWS, Backup servers, PLC panels of PT Plant, DCS Panels, Raw water pump house, Battery maintenance and UPS panels etc. in both PT Plant and Raw water Pump house/ Stage-I of Yadadri Thermal Power Station, Veerlapalem for the period of 01.04.2026 to 31.03.2027 or from the date of commencement of work 31.03.2027 for F.Y. 2026-27
TGGENCO-KTPP-Civil - Stage-II (1x600MW)- Up keeping all floors of TG building, auxiliary buildings, chemical lab building, open areas and drains in stage-II premises for the period from 01.05.2026 to 31.03.2027 at Kakatiya Thermal Power Project
BTPS - CHP - Maintenance of Apron feeders and Dribble feeders equipment viz pulleys, bearings/sleeves of pulleys, periodical and breakdown works as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027