Loading…
Loading…
1,910 results • Recent activity
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 2- Carrying out round-the-clock operations and minor repair works of Mill Rejects System from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO-YTPS (5x800MW) Stage1 Unit 2Carrying out preventive and routine maintenance and minor repair works of HP1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment as and when required for the period from 01.04.2026 oractual date of commencement to 31.03.2027
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 2 - Carrying out breakdown maintenance of Mill Rejection System of HP-1103 Bowl Mills as and when required on an urgent call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 2 - Carrying out breakdown maintenance of Gravimetric Feeders as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement of work for the year 2026-27.
Design, Manufacture, Inspection, Supply, Transportation to site, Erection, Testing and Commissioning of 3 nos of 8.8 m3/min inlet flow-rate capacity Reciprocating Air Compressors with 78 kgf/sq.cm discharge pressure along with required modification of existing pipe line, necessary hardware such as valves, control panels, sensors, indicators, electrical cables, PLC controls etc. for retrofitting in the existing compressed air system at Srisailam Left Bank Power House.
TGGENCO-YTPS(5X800 MW)-CI-IV- Testing, Calibration, Servicing of Pneumatic and Hydraulic actuators, MOVs and other C and I instrumentation in TG and TG Auxiliaries, UPS and Batteries, Condensate Polishing Unit in service Vessel area of Unit-4/Stage-II of Yadadri Thermal Power Station, Veerlapalem (V) for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027 for the FY 2026-27