Loading…
Loading…
1,923 results • Recent activity
Supply of gland packing ropes for clinker grinders, ash slurry pumps and HP pumps of bottom ash handling system
TGGENCO-CETD-Div-II- Supply and Installation of Split Air Conditioners for utilization at Suite Room in Hostel building and Welding Simulator room
TGGENCO YTPS 5x800MW Stage 1Unit1Carrying out preventive and routine maintenance and minor repair works of HP-1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment as and when required for the period from 01.04.2026 or actual date of commencement to 31.03.2027
TGGENCO - YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out breakdown maintenance of Mill Rejection System of HP-1103 Bowl Mills as and when required on an urgent call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 2- Carrying out round-the-clock operations and minor repair works of Mill Rejects System from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO-YTPS (5x800MW) Stage1 Unit 2Carrying out preventive and routine maintenance and minor repair works of HP1103 Bowl Mills, Gravimetric Feeders, Coal Pipes, Mill Lube Oil Systems, and their connected equipment as and when required for the period from 01.04.2026 oractual date of commencement to 31.03.2027