Loading…
Loading…
840 results • Latest
KTPS-V VI Stages - Civil- Removal and disposal of wet ash/ silt debris from the drains D5, D6, D7 and chambers of Sedimentation tank including disposal of dry ash deposits near sedimentation tank to ash pond of KTPS V VI Stages as and when required for the period from 01.04.2026 or actual date of commencement to 31.03.2027
TGGENCO KTPP CHP MM Belt jointing works by Cold and Hot Vulcanizing process, pulley lagging Edge and Patch repairs works for Coal Handling plant Conveying Systems as and when required with effect from April 2026 to March 2027 for the Year 2026 to 2027.
TGGENCO KTPP CHP MM Calibration of 05nos 100MT weighbridges at KTPP Chelpur for the period from 01.04.2026 to 31.03.2027.
Adhesives for cold and hot vulcanizing belt jointing works
ceramic rubber pulley lagging
T2 compound material
Vibro pulse screen spares
LS Geared Couplings BZWG 2240 and BZWG 5600
NSHES - Supply of Various Sizes of Seamless Pipes, Elbows, Flanges, Welding Electrodes, Bolts and Nuts and Other Consumables at NSHES, Nagarjuna Sagar.
TGGENCO - NSHES - Supply of Certain Plumbing Material at NSHES, Nagarjunasagar.