Loading…
Loading…
1,917 results • Recent activity
Supply, installation and commissioning of three pillar multiplay station for children park at Bombay colony area of KTPS VII Stage
Supply of simmer rings for main bearing assembly for PA fans in Unit-IX and X
KTPS-STAGE-VII-OANDM-I-SD-III-Attending repairs to the manual operated rolling shutters of storage shed no.44 and 45 in the Central stores of KTPS O AND M Stage-VII
TGGENCO YTPS CHP MMII Complete Mechanical maintenance of wagon tippler 3 and 4, sidearmchargers 3 and 4, apron feeders, dribble conveyors, Track hopper 2,paddle feeders, stacker 2 and 3,reclaimer2,sump pumps, compressors and connected equipment of Stage II in Coal Handling Plant in priority path of Stage II YTPS 5X800MW from 01 04 2026 or actual date of commencement to 61 days
BTPS - CHP - Checking of all chutes and flap gates from BCN-1A/B conveyor to bunker floor as and when required in Operation and Electrical division of CHP/BTPS for a period of 03 months i.e from 01.07.2026 or from actual date of commencement of work
BTPS - CHP - Replacement of damaged scoop coupling with reconditioned spare scoop coupling, oil filter cleaning, cooler cleaning, replacement of damaged DE/NDE bearing, geared coupling, realignments for ring granulator as and when required at MM-II subdivision of MM/CHP/BTPS from 01.04.2026 or from actual date of commencement of work up to 31.03.2027.