Loading…
Loading…
840 results • Latest
TGGENCO BTPS STAGE-II BM Division - Providing of Labour assistance in maintenance for removal, cleaning their internals, testing and assembling of guns in all elevations in Boiler furnace and also for cleaning oil leakages if any and dust at Oil skids, steam lines for guns at Unit 3 and Unit 4 Stage-II/BTPS, Manuguru for the FY 2026-27
TGGENCO BTPS STAGE II GEN Division Labour charges towards attending operational issues of running equipment in areas such as Boiler Floor Turbine Floor Mills, Fans Area ESP Control Room CWP Pump House Fuel Oil Pump House Air Compressor Rooms and Ash Plant Area of Unit 3 Stg-II BTPS whenever and wherever required for FY-2026-27 i.e., for the period 01-04-2026 to 31-03-2027
KTPS-V Stage -EM and MRT- Deputation of service engineer for Servicing of 220V DC, 150A Float and 250A Float cum Boost Chargers-Main and Stand By of STATCON make Chargers of Unit-X at KTPS-V Stage for the year 2026-27.-Reg
TGGENCO-CETD- Suply of 2 No.s Wireless Collar Mic for utilization in CETD TGGENCO, Paloncha
BTPS-CHP-Inspection, repair and cleaning of DFDS water sprinkling systems and greasing to the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, Flap gates and tipper at MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.2026 or from actual date of commencement of the work to 31.03.2027.
BTPS-CHP-Preventive and breakdown maintenance of gear box/ couplings/scoop couplings, belt conveyors and conveyor equipment for SCRs and the conveyors BCN-8, BCN-9 as and when required MM-IV subdivision of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS-CHP-Preventive and Breakdown maintenance of Tripper, ILMS-3 and 4, Flap gate actuators, Guide pipes and Bunker sealing belt as and when required in MM-III sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Preventive and breakdown maintenance of Pulleys, Bearings/Sleeves of Pulleys and scoop oil cooling system as and when required for the conveyors BCN-4A/B, 5A/B, 6A/B, BCN-10, 7A/B, ILMS, Trippers and flap gates required in MM-III sub division of MM/CHP/BTPS from 01.04.2026 or actual date of commencement of work to 31.03.2027
BTPS-CHP-Regular and preventive maintenance of 04 Nos BD-355 Dozers and 02 Nos BL200-1 Wheel loaders required in MM-IV sub division of MM/CHP/BTPS for the period of from 01.04.2026 or from actual date of commencement of work to 31.03.2027.
BTPS-CHP-Regular and preventive periodical maintenance for Belt Feeder-1,2,3 and 4 and flap gates as and when required in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027