Loading…
Loading…
840 results • Latest
BTPS-CHP-Clearing of all chutes and flap gates from BCN-1A/1B conveyor to bunker floor required in Operation and Electrical division of CHP/BTPS for a period of 03Months from 01.04.2026 or from actual date of commencement of work
BTPS-CHP- Up-Keeping and cleaning of all field control panels from TP-3 to Bunker floor, ERH VF panels, SM-3 and 4 and ILMS-3 and 4, Rectifier and starter panels, Lighting LPs, Power and control JBs, LPBS, ERH Sump Pump panels, Welding receptacles in LT-II sub division of Operation and Electrical/CHP/BTPS for the period from 01.04.2026 or from actual date of commencement of work to 31.03.2027.
BTPS-CHP- Up-Keeping and cleaning of all DCS panels and network panels, BWP panels, LVS/OWS/EWS of panels of MCC-1, MCC-2, MCC-3, DE systems panels, VMS panels, Stacker panels, Paddle feeder panels, VFD panels, ERH panels, FDA panels and Belt weighers panels, RDM panels of MCC-1, MCC-2, MCC-3, Control JBs PCS, BSS and ZSS from BCN-1A/B to BCN-10, in all TPs and up to bunker floor etc. for the period from 01.04.2026 or from the actual date of commencement of work to 31.03.2027.
BTPS-CHP-Removing, cleaning, testing and refixing of DV valve solenoids pressure switches MSD/MSD-RI detectors MCP/Flame proof MCPs pressure gauges and LSN loop cards in PLC panel, DV valve cards and instrumentation, IRD on BCN-1A/B, BCN-2A/B, BCN-3A/B, BCN-4A/B, BCN-5A/B, BCN- 6A/B, BCN-7A/B, BCN-10 of MFAP-03 area covers fuel oil unloading pump house, PT plant, STP plant, ETP plant, DM plant, RAW water pump house, transfer points of CHP, panel rooms and cable galleries of CHP MCCs for the year 2026-27 required in Operation and Electrical maintenance division of CHP/BTPS
BTPS - CHP - Checking of all Chutes and flap gates from BCN-1A/1B conveyor to bunker floor as and when required for the period of 03 Months from 01.04.2026 or from actual date of commencement of work required in Operation and Electrical division of CHP/BTPS.
BTPS-CHP-Regular maintenance and minor repair works of stacker cum reclaimer 1 and 2 for electrical equipment for the period from 01.04.2026 or from actual date of utilization to 31.03.2027 required in LT-II/Operation and Electrical/CHP/BTPS
BTPS - CHP - Replacement of Landing valves/Butterfly valves, Washers for fire hydrant system, NRV/Y-Strainers/Knob valves/QBDs/Spray nozzles in the Trim kit of Spray system and Gland ropes for gate valves, preventive / Periodical maintenance works to be taken up in the firefighting hydrant and spray system and Arresting of water leaks in firefighting lines of firefighting system / CHP/BTPS for the year 2026-27 in General division of CHP/BTPS.
TGGENCO-KTPP-Stage-II-BMD-Transportation of Mill Reject ground coal from mill pits,Mill trenches, sumps and mill around area to reject coal stockyards for mills A to H of mill reject system and clearing of spillover coal and coal powder surrounding of mills (A to H) in Boiler Maintenance Division(1*600MW) for FY 2026-27 from actual date of utilization to till the completion of quantity.
Hiring of a consulting organization to implement ISO 27001:2022 Information Security Management System (ISMS) and to provide ISO 27001 certification for TGGENCO through an accredited certification agency for a period of 3 Years
KTPS-V-BM-Replacement of 400 No.s Cylindrical Liners, 80 No.s Oblique Wave Liners and 80 No.s Long and Short Conical Liners each in Mill- 9 EF and Mill-10 AB.-Reg