Loading…
Loading…
840 results • Latest
KTPS-VII Stage-ADM-S n S-Providing of one No. Jeep on hire basis @12 hrs/day, including fixed charges, fuel charges, driver salary, maintenance charges, road taxes, Insurance, all statutory payments etc., with a mileage up to 1500 KM/Month for the official utilization by the Divisional Engineer/S n S/KTPS-VII Stage, for the period from 01-04-2026 (or) from actual date of commencement to 31-03-2027
SPF-Providing of one No. Jeep on hire basis at 24 hrs/day, including fixed charges, fuel charges,
TGGENCO-YTPS (5x800 MW) - Providing 1 No. AC Car/Jeep along with driver with a mileage for 6000KM/Month Usage time of 24hrs/day on hire basis to attend emergency breakdown works of Unit-I Unit-II Unit-IV with usage time of 24 Hrs/day at YTPS, Veerlapalem(V), Dameracherla(M), Nalgonda District from the period 01.04.2026 or actual utilization to 31.03.2027
TGGENCO-KTPP-Civil-PHD-Stage-I- Shifting and Fixing of EOT Hoist at Dozer shed-II duly dismantling existing EOT Hoist from WFAHS building
TGGENCO BTPS STAGE II CAM Division Preventive / Periodical Maintenance works of Dry fly ash lines, fluidizing lines and ESP hoppers in Unit-3 and 4 of Ash Handling System of CAM Division/Stage-II/BTPS, Manuguru for the financial year 2026-27
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance and Regular maintenance works of Bottom Ash Hoppers and connected equipment in Unit3 and 4 Ash Handling System of Stage II BTPS during April 2026 to March 2027 during the financial year 2026-27
TGGENCO BTPS STAGE II CAM Division Emergency rectification preventive and periodical maintenance of Ash Slurry Disposal lines 1 2 and 3 from Slurry Pump House to their respective discharge points on ash pond dyke during the year 2026-27
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance works of various dome valves other valves Buffer Hoppers filter bags, Transport Air Compressor Instrument Air Compressor Dryers and Fluidizing Air Blowers in Dry fly ash system of Unit-3 and 4 in Ash Handling System of CAM Division Stage-II BTPS Manuguru for the financial year 2026-27
TGGENCO BTPS STAGEII GEN Division Up Keeping Cleaning and Removal of Cotton waste iron scrap wood scrap Spider webs debris sweeping and wet cleaning of UCB Stage II in front of UCB TG Floors of Unit3 and 4 H2 Filling rooms of Unit 3 and 4 and as per the instructions of the officials on emergency requirement at times of the areas of Unit 3 and 4 of Stage II BTPS for the period from 01-04-2026 to 31-03-2027
TGGENCO BTPS STAGE II GEN Division Labour charges for attending operational issues of running equipment for round the clock for monitoring of Sump level and equipment healthiness at Ash Water Recovery Pump House for FY-2026-27 i.e. for the period 01-04-2026 to 31-03-2027