Loading…
Loading…
1,912 results • Recent activity
Supply of Pulverised fuel straight pipes for Unit-X overhaul
KTPS-VII Stage-Civil-O and M-II- Cleaning of over head tanks in A and B Camp areas in the year 2026-27
TGGENCO-YTPS(5x800MW)-Stage-1- Unit-1 Carrying out breakdown maintenance works of Air-preheaters and overhaul of Air-preheaters and its gearboxes in Unit-1 as and when required on an urgent on call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
TGGENCO-YTPS(5x800MW)-BE-II-Loading Unloading Transportation and Cleaning of mill rejects coal debris AND coal from feeder floor area, mill pits, mill surrounding area at zero meter and dumping at the designated area earmarked in the coal plant on as and when required basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCOTGGENCO -YTPS (5x800MW)-Stage-1 Unit 2 Carrying out breakdown maintenance of journal bearings, scraper and material handling components, sealing arrangements and associated internal wear parts, classifier components, mill lube oil system, pneumatic gates, coal pipes, overhaul of seal air fan on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 2 - Carrying out breakdown maintenance of Bowl Mill grinding roll assemblies with roll sleeve, ring roll setting, roll journal yoke assemblies, tension rods, spring loading system components and removal of foreign materials as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement