Loading…
Loading…
1,912 results • Recent activity
Diamond grooved rubber lagging sheets/mats for conveyor pulleys
TGGENCO- YTPS (5x800MW)- Stage-1 -Unit 1-Carrying out breakdown maintenance of Bowl Mill grinding roll assemblies with roll sleeve, ring roll setting, roll journal yoke assemblies, tension rods, spring loading system components and removal of foreign materials as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
TGGENCO-YTPS (5x800MW)-Stage-1-Unit 1-Carrying out breakdown maintenance of journal bearings, scraper and material handling components, sealing arrangements and associated internal wear parts, classifier components, mill lube oil system, pneumatic gates, coal pipes, overhaul of seal air fan on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1-Carrying out breakdown maintenance of PA, FD and ID Fans in Unit-I as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO- YTPS (5x800MW)-Stage-1-Unit-1 -Carrying out breakdown maintenance of ESP fields in Unit-1 as and when required on an urgent on-call basis from 01.04.2026 to 31.03.2027 to be reckoned from the actual date of commencement
TGGENCO-YTPS(5X800 MW)- BE-IV - Loading, transportation , unloading and cleaning of mill rejects coal, debris and coal from feeders floor area, mill pits, mill surrounding area at zero meter and dumping at the designated area earmarked in the coal plant on as and when required basis from 01.04.2026 to 31.03.2027 to be reckoned from actual date of commencement to 31.03.2027 of Boiler-IV/Stage-II/YTPS