Loading…
Loading…
1,912 results • Recent activity
LT Fuses for LT switchgear panels
welding electrodes
TGGENCO-KTPS VII Stage/Paloncha - Supply of Iron analyzer for 6 samples in SWAS room
BTPS - CHP - Overhauling of damaged scoop coupling model ESC:1030 of ring granulators as and when required in MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027
KTPS-V stage -BM-Bending, Fabrication and erection of the damaged / worn-out portion /Replacement of Guide vanes for Flue gas Ducts of Unit-X during Overhaul of 2026-27.-Reg
Supply of open well horizontal type submersible pumps of capacity 10HP (7.5KW) and 2HP for carrying out dewatering operations at 400KV and 220KV switchyard pertaining to EM/Stage-I/BTPS