Loading…
Loading…
1,915 results • Recent activity
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Carrying out preventive, routine maintenance and minor repair works of APH, PA Fans, FD Fans, ID Fans, ESPs, Ducts AND Gate areas of Boiler-I as and when required for the period from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement
TGGENCO-YTPS(5X800MW)-Stage I - Unit 2-TMD- Carrying out Works for the Condensate Path System, comprising Condensate Extraction Pumps (CEP) and Condensate Polishing Unit (CPU), Unit- 2 Turbine Maintenance Division, for the Year 2026-27
TGGENCO-YTPS(5X800MW)-Stage I - Unit 1-TMD- Carrying out Works for the Condensate Path System, comprising Condensate Extraction Pumps (CEP) and Condensate Polishing Unit (CPU), Unit-1 Turbine Maintenance Division, for the Year 2026-27
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 1 - Boiler Loading, transportation, unloading and cleaning of mill rejects coal, debris and coal from feeder floor area, mill pits, mill surrounding area at zero meter and dumping at the designated area earmarked in the coal plant on as and when required basis from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement.
TGGENCO- YTPS (5x800MW) - Stage-1 - Unit 2 - Rectification of tube leaks in Boiler-2, on an urgent on-call basis during emergency shutdown from 01.04.2026 to 31.03.2027, to be reckoned from the actual date of commencement to 31.03.2027
TGGENCO Renovation of Suite Nos. 1S1, 1S2, 2S1, 2S2, 3S1 and 3S2 including flooring with vitrified tiles and internal painting of Guest House at TGGENCO building, GTS Colony, Erragadda, Hyderabad