Loading…
Loading…
1,916 results • Recent activity
KTPS-V stage -BM-Patch welding to be done for Rectification of Damaged Flue Gas Duct from APH B hopper to chimney along the path CD side flue gas duct and its honeycomb structure (C and D)after dismantling the damaged worn-out portion of Flue Gas Ducts for overhaul of Unit-X.
TGGENCO YTPS 5X800MW CHP Carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of BCN 25, BCN26, BCN7, BCN8AB, BCN9AB, BCN10AB, BCN11AB, BCN12AB, BCN13AB, BCN14AB, BCN15AB in CHP and to carryout any other works as instructed by Engineerincharge for providing uninterrupted coal feeding to Unit Bunkers from 01 04 2026 or actual date of commencement.
TGGENCO YTPS CHP Clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the Track Hopper 2 grid wagon tippler 3and4 grid TTR grids, clearing of sticky wet coal by Poking inside coal wagons,Opening of BOBRN wagon doors for unloading of coal, engaging cutter welder for opening closing of welded wagon doors whenever required and clearing of Apron feeder and dribble conveyor jams, along with tools and tackles for unloading and any other coal clearing works as instructed by engineer incharge from 01 04 2026 or actual date of commencement.
TGGENCO YTPS CHP Clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the Track Hopper1 grid or wagon tippler 1 and 2 grid TTR grids, clearing of sticky wet coal by Poking inside coal wagons,Opening of BOBRN wagon doors for unloading of coal, engaging cutter or welder for opening or closing of welded wagon doors whenever required and clearing of Apron feeder and dribble conveyor jams, along with tools and tackles for unloading and any other coal clearing works as instructed by engineerincharge from 01 04 2026 or actual date of commencement.
TGGENCO YTPS 5X800MW CHP Carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of BCN 21AB, BCN22AB, BCN23AB, RBCN 2AB, TPC2AB, VGF 5,6,7,8, BF 5,6,7,8, Crusher 5,6,7,8, BCN24AB, BCN27AB in CHP and to carryout any other works as instructed by Engineer incharge for providing uninterrupted coal feeding to Unit Bunkers from 01 04 2026 or actual date of commencement
Supply of LED Lighting fixtures pertaining to EM div/Stage-II/BTPS