Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
566 live285 closing this weekmost from TNEB Limited
566 results • Latest
Civil cum electrical works for the establishment of 110 11 kv thalamalai SS in Erode region
Supply,erection,testing commissioning of 400 kV DC line with Quad Moose ACSR conductor from Udangudi Pooling Station to Common point (Loc. AP 45 of Kayathar Thennampatti 400 kV line DC line) Reach I - From Udangudi Pooling Station to Loc 104)
Overhauling and rectification of defects in Air cooled condenser fan and its Gear boxes No 5 7 9 of Condensate system including consumables at KGTPS Maruthur
Hydraulic Testing Replacement of valves and filling of 900 Kg liquid Chlorine in empty cylinders for 2 Nos including to and fro transporting charges of cylinders at KGTPS Maruthur
MTPS-II-M-II-CHP-II- Stacker-Cum-Reclaimer Machines- Repairing 1No. 630mm Dia Double wheel drive bogie assembly
Providing new galvalume sheet fencing at the south ( 0 to 45m side of Central store in Pudukkottai Circle
Improvement estimate for providing of 1 No. New Double pole ABS in 11KV Kallukatti feeder at Aruthenganvilai area under Rajakkamangalam section
NCTPS I SEMII Circle AHP Dn Watch and ward round the clock Routine Maintenance and Breakdown in Ash slurry Disposal Lines from NCTPS stageII Compound wall to Recovery water pump house for a period of One year from the date of taken over of site
Improvement estimate for LT 3 phase 4 wire line conductor strengthening in Holy cross colleges SSI, SM Nagar SSI, Hindu College SS under Vallankumaranvilai Distribution Section in Nagercoil Division.
Supply of Stay Clamp Pairs for 8M PSC Pole 9500 Pairs As per the enclosed Sketch and Technical Specification
Improvement works to the Thirumayam Substore by renovating the existing substore building, providing a new Galvalume sheet shed with PCC Platform for material stacking and providing new chain link fencing around the stacking yard at Thirumayam Divi
Improvement estimate for prepared in replacement of detorated structure of 1 no Station Transformer in Sub Station of 33 11 KV SS Thadikkarankonnam under Azhaiyapandipuram Section
NCTPS I SEMII Circle AHP DnWatch and Ward round the clock routine maintenance and breakdown in Ash Slurry Disposal Line from Recovery Water pump house to Ash dyke for a period of one year from the date of taken over of site
NCTPS I SEMII Circle AHP Dn Watch and Ward round the clock routine maintenance and breakdown in Ash Slurry Disposal Line from Ash Handling Pump House to NCTPS stage II compound wall for a period of one year from the date of taken over of site
DCW estimate for 1 NO 8 mtr. PSC pole shifting with 3 phase side arm stud requested by Thivadudurai Aaditheenam vagai, Senthilkumar, Ambalavanan Nager in Vallankumaranvilai section
NCTPS I Operation Circle O and E Division Fire Fighting Attending breakdowns in pipelines of Fire Hydrant slash HVWS system for a period of One Year from the date of handing over of site
Procurement of various Electromechanical Relays in Unit I and Unit II
Vehicle Contract towards hiring of Vehicle to Assistant Engineer Cables Adyar EDC for a period of three years from the date of receipt of award of contract under open tender
Supply of SS Woven wire mesh for Unit IV and V Bottom Ash Hopper
Common Auxiliaries Division Rectification / reconditioning of electrolysers in Electro Chlorination Plant for effective Sodium Hypochlorite generation
Fabrication and Erection of 250NB 300NB 350NB and 400NB size MS ERW bends of various degrees with inside SS liners and Y pieces for Bottom Ash A stream conveying Pipe lines during COH 2026
ECHP-I-Leading, Lifting, Loading, Transporting and unloading of 400 meters conveyor belt from NCTPS-I North Chennai to TTPS Tuticorin.
ECHP-I-Complete overhauling and load testing of 1 No. 15Ton electrical wire rope hoists at Conveyor-17 head end in JT-5E.
ICHP- Loading, transporting, unloading and stacking of 2 Nos. Condemned Bull Dozers devolute to Central Stores from Dozer shed.
MTPS II 600MW ES Circle EM Division Releasing Replacement and Complete overhauling of TAC and Seal air fan HT motors rating of 280KW 355KW to 450KW in AHP and Mill area if any failure for the period of 365days
MTPS I Mill Plant Unit II Clearing the Mill rejects from Unit I II Mill Feeder area weighing in departmental weigh bridge and Transporting to rejects yard G switch yard area coal yard by using contractors vehicle and unloading the same and return
civil cum electrical works for the establishment of 110/22 kv Bellepalayam SS inside the premises of 400 kv Karamadai SS
Housekeeping and Conservancy Work including Cleaning of toilet, wash basin, elevator car, antitermite spraying and garden work etc. in Anna building at Tirunelveli central office campus.(Period of 1year 2026-2027)
Arresting of oil leak in 90MVA Power Transformer by Gasket replacement in Radiator butterfly Valve and its inspection door using oil filtration machine and crane at KGTPS / Maruthur
Civil cum Electrical works for the establishment of 110/11 kv Karichipalayam SS at Mooperipalyam in coimbatore region
supply of aluminium flat 50x12mm
MTPS II MI Circle OAHS Collecting the falling ash from ESP hoppers floor area of CD Passes transporting the same to Upper ash dyke by using contractors vehicle unloading at Upper Ash Dyke location and return
MTP5-II-Coal Handling Plant-I- Reconditioning of the Rotor Shaft Assembly
MTPS II MI Circle OAHS Collecting the falling ash from ESP hoppers floor area of A B Passes transporting the same to Upper ash dyke by using contractors vehicle unloading at Upper Ash Dyke location and return
MTPS-II-CHP-II - Reconditioning Of Components Of the defective radial piston type hydraulic motor Model CA 140 140 SBONHC 02000 Make Hagglunds retrieved from Slew Power Pack side of SCR-II slew motor side by dismantling
MTPS II MI Circle Oil AHS Collecting the falling ash from ESP hoppers floor area around ID Fan transporting the same to Upper ash dyke by using contractors vehicle unloading at Upper Ash Dyke location and return
MTPS I Operation Circle Chemical Division Engaging of External agency on works contract basis for collection of pulverised coal oil water gas steam and hydrogen flue gas samples on round the clock basis for analysis works for a period of 365 days
MTPS1 Operation circle-Chemical Division Engaging of external agency on works contract basis for collection of received coal bunkered coal and fly ash bottom ash sample on round the clock basis for analysis for a period of 365 days from the date of
Complete Rewinding of 3 Nos ACC Motor and replacement of DE and NDE bearings with new bearings including material labour and transportation charges and painting works at KGTPS Maruthur
Replacement of Mechanical Seal in NDE side of HP Boiler Feed Pump No 1 including cost of bearings at KGTPS Maruthur
Procurement of MS Plate for APH and Flue Gas Duct 02 Items
Procurement of Various size of MS ERW pipes 03 Items
Supply of Cold End Gratings for both APH mode 13494 2200 02 Sets
Design, Detailed Engineering, Manufacture, Supply, Erection, Testing and commissioning of GANGAIKONDAN 230/110KV AIS SS excluding supply and erection of 2x100MVA,230/110KV Auto Transformer at Gangaikondan SIPCOT Premises in Tirunelveli EDC