Loading…
Loading…
6,644 results • Recent activity
MTPS I CA CWS I Load testing of 10 Ton Electrical hoist 1 No 15 Ton Electrical hoist 1 No 30 Ton EOT crane 1 No and revisioning of brake assemblies with thruster units and allied works
MTPS I BM Pressure parts Units I and II Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
MTPS I M I Circle CA FP Replacement of worn out puncture Headers pipelines in Hydrant Emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Supply of 20 Nos welding sockets and plug Distribution Board with 1 No 63A 2 Nos 32A 2 Nos 20A Sockets and Plug assembly with Non corroded poly carbonate Enclosure for Unit I and II
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 1 No Cooling Water Pump of capacity 16000 M3 Hr Single Stage VMF Model 1175 KW motor in stage I
MTPS I BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works