Loading…
Loading…
6,644 results • Recent activity
MTPS I CA RWS Misc Clarifier I De watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
MTPS I BM Lift Preventive Breakdown maintenance of 3 Nos Freight cum Passenger lifts Boiler Lift I Boiler Lift IV and VIP Lift II of MTPS I for the period of one year from the date of commencement of work
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 4 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in CT II
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I CA RWS Overhauling of Raw Water Pump No 04 and its butterfly valve Reconditioning of trash rack gates at Raw water pump house
MTPS I M I CA CWS I Fabrication of sun shield roof structure for replacing a portion of damaged Corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of Cooling Tower II during COH 24 25 of Unit II