6,614 results • Recent activity
MTPS 1 Mill Plant Unit IV Attending the Break down Preventive maintenance works such as overhauling of Gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing, worm shaft thrust and radial bearing
MTPS I BM Unit II COH 2024 25 FG duct B side Dismantling fabrication supply and erection of portion of Flue gas ducts from APH outlet to 45 degree slope end
MTPS I Mill Plant Unit IV Attending the Break down Preventive maintenance works such as overhauling of journal assemblies spring compression assemblies hard facing of clamping ring bowl hub cover strengthening welding of journal header etc
MTPS I BM Unit II COH 2024 25 FG duct A side Dismantling fabrication supply and erection of portion of Flue gas ducts from APH outlet to 45 degree slope end
MTPS I Mill Plant AC Plant Unit II AOH 2025 26 Air Washer System Epoxy painting of blowers discharge duct spray system enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works replacement of damaged duct area
MTPS I Mill Plant Unit II Overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder Renewal of hot air gate seal during AOH 2025 26