Procurement of Air Restriction Ring 03 Items and Mill Side Top Liners 12 Sets For XRP Mills
MTPS I TM Unit IV Removal and Re insulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
MTPS 1 BM Unit IV Annual maintenance 2025 26 Hot primary air ducts and hot Secondary air ducts of A and B sides Cleaning the accumulated ash arresting the air leakage by rectification of the damper and allied works
Erection of 110 KV DC Line on DC tower (2.690kM)by making LILO in the existing 110 KV Theni Periyar I Feeder for the Proposed K.K.Patty 110 kV SS with supply of all materials(Reach 3)
MTPS I BM Unit I to IV Boiler Pressure Parts Safety Valve floating during AOH 2025
Erection of 110 KV DC Line on DC tower (2.490kM)by making LILO in the existing 110 KV Theni Periyar I Feeder for the Proposed K.K.Patty 110 kV SS with supply of all materials(Reach 2).