Loading…
Loading…
6,449 results • Recent activity
NCTPS I SE MI Circle AOH 25 26 MPM Dn Unit III Corner 3 4 Overhauling of Worn out Fuel inlet elbows by dismantling lowering to boiler floor Rectification Renewal aligning and assembling the new rectified Fuel inlet elbows and rectification
NCTPS I SE MI Circle AOH 25 26 MPM Dn Unit III Corners 1 2 Overhauling of wornout Fuel inlet elbows by dismantling lowering to boiler floor rectification renewal aligning and assembling the new rectified Fuel inlet elbows and rectification
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection and tube thickness survey in water wall and platen SH inspection
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation and its accessories in Burner corner wind box pent house 1st pass Drum enclosure WWSB Dock house Eco ring header S panel and 2nd pass Dock house
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Removal relaying boiler Insulation in boiler rear side and both left and right side corner from 24 mtr to 52 mtr during Annual Overhaul 2025 26
150W High Bay LED Lights, 150W LED Flood Lights and 200W LED Lights