Loading…
Loading…
6,346 results • Recent activity
Strengthening and Raising the North side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 300m to CH 450m from hump towards spillway
Supply of 3 Phase 415V 110KW Draw out Type LT Module
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 150m to CH 300m from hump towards spillway
As per NIT
ECHP-II Complete overhauling of 8 Ton, 5 Ton and 2 Ton capacity electrical hoist with trolley including dismantling and re-erection at TT-7 Top floor, Conveyor 61 tail end, Conveyor 61 head end, drive house floor of Conveyor-61, Conveyor-73 head
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 0m to CH 150m from hump towards spillway