Loading…
Loading…
6,346 results • Recent activity
ICHP- Rewinding and re-insulation of 6.6 KV, 240 KW, Kirloskar make HT motor Sl.No.3900502-03 by replacement of Y phase stator winding consisting of 20 coils including transportation etc.,
Dragging out the floor ash under C Pass of ESP by using the Front End Bar Loader to facilitate the manual unloading hopper ash at C Pass
ECHP-I- Providing rubber lagging of various conveyor pulleys in ECHP-I Division
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded boom conveyor structures MCC room and operator cabin in Stacker 1B
Excavation Stub Setting Concreting Supply of tower line materials Erection and Stringing in LILO of Proposed Alamathy - Periyapalayam 110kV feeder at Proposed Kilanur 110kV SS from Loc 54 to Gantry Reach V
ICHP- Clearing the juliflora jungle without uprooting, construction of RCC pedestal cleaning and painting of cable tray support structures and columns located from CHS-V to TT-4