Loading…
Loading…
6,360 results • Latest
TTPS Mech II AHP Breakdown maintenance works in Ash slurry disposal lines of Unit III for the period from 01 04 2026 to 31 03 2027
ICHP- Cleaning of the spilled and accumulated coal in Stacker-I II and Reclaimer-I II machines associated areas and removal of coal chocking in coal transfer chutes in all the four machines.
TTPS MechII AHP Unit I II III Breakdown maintenance works of HDPE pipes and fittings of size 40mm and 75mm OD and rubber lining of 80 NB to 450 NB MS pipes fittings flushing apparatus in Unit I II III ECO APH hoppers for the period from 01
Repair and Maintenance Works to the Sunshade, Loft, Roof Terrace Tiles, Rain Water Downfall Pipes and Inner Rooms in Type 1 Quarters Block No. 13, 15 and 19 at Analmin Nagar
ICHP -Clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of Stacker-II and Reclaimer-II machine travel path in Conveyor-54.
TTPS Mech II AHP Removing the silt like ash coal and sand in slurry form below and front and backside of the weighbridge and in between the weighbridge and support walls for the period from 01 04 2026 to 31 03 2027