Loading…
Loading…
6,335 results • Latest
TTPS Mech II BM Unit I II III Boiler Inspection checking and opening closing of valves in Deaerator PRDS, Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8 mtr peep hole door and take necessary action for poking opening closing
TTPS MechII AHP Unit III BAH Attending breakdown maintenance works in BAHIII for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle OE II Inspection, checking of pipelines of emulsifier and hydrant system and assisting to shift operator in all activities at clarified water pump house by recording the parameters of pumps, motors, diesel engine, valves and
TTPS Operation Circle OE II Inspection, checking of pipelines of emulsifier and hydrant system and assisting to shift operator in all activities at raw water pump house by recording the parameters of pumps, motors, diesel engine, valves and check
Dindigul EDC - Supply of 22 KV STAND ALONE AB SWITCH WITH STRUCTURE MATERIAL COMPLETE SET
TTPS Operation Circle OE II Maintenance of Fire Alarm System such as Smoke detectors Heat detectors Manual Call Points and Linear Heat Detection Cables for Conveyors for the period from 01.04.2026 to 31.03.2027