Loading…
Loading…
6,215 results • Latest
NCTPS II Civil Maintenance Circle Civil Project Division Operation and maintenance of 600KLD Sewage Treatment Plant at Vallur camp for the period of one year from 01.04.2026 to 31.03.2027 or from the date of commencement
NCTPS I SEMII Circle ECHS Dn Renovation of most corroded damaged technological Structures at the coal berthI II area in the conveyor BCN40B
NCTPS I SEMII Circle ECHS Dn Renewal of worn out CST9 sleeper steel sleeper by PSC sleeper T2496 at track No 11 which is released from M s KPL this work includes leading of PSC Sleeper from road approach area to track line area
Detailed Engineering, Design, Manufacture, Supply, Erection,Testing Commissioning of 400kV DC line on MC towers with Twin HTLS conductor by converting existing 230KV SC line on SC tower with Kundha conductor on PH3-Karamadai Loc 82- 105 (Reach-III)
Detailed Engineering, Design, Manufacture, Supply, Erection, Testing and Commissioning of 400 kV DC line on MC towers with Twin HTLS conductor by converting existing 230KV SC line on SC tower with Kundha conductor on PH3-Karamadai Loc 57-82 -Reach-II
Detailed Engineering, Design, Manufacture, Supply, Erection, Testing and Commissioning of 400 kV DC line on DC towers with Twin HTLS conductor by converting existing 230 KV SC line on SC tower with Kundha conductor on PH3 - Karamadai (Reach-I)