Loading
Loading…
Loading…
6,215 results • Latest
Cleaning and Painting of inner surface area of the DM water storage tank
Daily Maintenance in three shifts checking
Supply of High pressure water wall rifled tubes for 600MW Boiler
MTPS I M II OAHS Stage I Ash Slurry Lines Replacement of existing 1800 Mtr length of M S ERW pipelines with the administratively approved
MTPS I M II OAHS Ash water Recovery system I Dismantling the existing heavily damaged 350 NB
MTPS I MII Circle OAHS Retrieving the accumulated ash over and under the 08 Nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from B1