Loading…
Loading…
6,176 results • Latest
SUPPLY, ERECTION and COMMISSIONING OF CONDUCTIVITY ANALYZER and PH ANALYZER FOR SWAS ONLINE MONITORING IN UNIT-II OF NCTPS I
TTPS Mech II AHP Ash Slurry disposal lines in unit III Strengthening of 340 mm OD cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 6 of unit III ash slurry disposal lines in betwe
TTPS Mech II AHP Overhauling and load testing of 5 0 Ton capacity EOT cranes at Stage I II Ash Slurry Pump House
TTPS Mech II AHP Renewal of wornout portions of North side Bottom ash hopper body plate South side vertical column box BAH structural supports walkway platform with staircase around BAH and seal trough in Unit I BAH during forthcoming overhaul
TTPS Mech II AHP Plastering of refractory cement inside Unit I BAH and removal of ash slag and debris from BAH floor and trenches during forthcoming overhaul
TTPS Mech II AHP Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during forthcoming overhaul