Loading…
Loading…
6,176 results • Latest
TTPS Mech II AHP Renewal of wornout South side vertical column box BAH structural supports, walkway platform with staircase around BAH seal trough and makeup valve in Unit II BAH during the forthcoming annual overhaul
TTPS Mech II AHP Renewal of worn out portions of Bottom ash hopper body plate connected structural supports and BAH supporting vertical columns in North East and West side dismantling and erection of BAH overflow trough and its outlet pipe lines in
TTPS Mech II AHP Replacement of Regular make up jetting assembly connected pipe Lines flushing header assembly overhauling of valves cleaning and welding of seal trough in unit II BAH during the forthcoming annual overhaul
Supply of RAIN COAT
Remedial measures by Strengthening and Providing Protective Coating in the RCC PSC Structures in Conveyor - 15 Long Span 35 - 39 and Short Span 40 - 41 in Red Gate area North Break Water of VOC Port at ECHS areas
TTPS Mech II AHP Unit II Attending overhauling works in Unit II ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms duri