Loading…
Loading…
6,149 results • Latest
stub setting concreting erection stringing 230kv sc line on sc tower KTR SPR 230 R3
TTPS Operation Circle MPM I Unit I Strengthening of mill 1A bunker by renewal of eroded neck bolts, provision of guard plate for bolts inside the bunker, renewal of corroded corner angles, provision of clip plates, provision of side wall support on
TTPS Mech II BM Supply and Providing of 1 No new 5000 litres sintex tank for RO Plant at DM Plant I
TTPS Operation Circle MPM I Unit I Strengthening of mill 1B bunker by renewal of eroded neck bolts, provision of guard plate for bolts inside the bunker, renewal of corroded corner angles, provision of clip plates, provision of side wall support on
Labour charges for Laying, Releasing and Both end termination of 116 mtrs of 3 Core X 185 sqmm Aluminum Armoured LT Power cable from PMCC-II (17F3) to Air Cooled Condenser fan Motor # 8 motor, 125 mtrs of 3 Core X 185 sqmm Aluminum Armoured LT Power
MTPS I - Civil Circle - Repair works to the old Diesel pump room in central store and sludge disposal room stage I in b/w clarifier I and II of MTPS I