Supply of Plunger Type Phosphate dozing pump complete assembly along with Base frame Energy efficient Motor
Rectification Works to the Deck Slab, Column, Beams in the Stopper Gate area in Cooling Water Skimmer Bay Intake Channel 1 of Yellow Gate - North Break Water area
Supply of 11KV Metal Parts
Rectification Works to the Damaged Ash Slurry Line Pedestals of Units 1 to 3 from JT 3 West side to AEE AHP Building South side in Unit 4 and 5 area
Rectification Works to the Damaged Ash Slurry Line Pedestals of Units 1 to 3 from ASPH West side to JT 3 West side in Unit 4 and area
MTPS I M I CA CWS I Replacement of corroded and eroded blow down pipe line in cooling tower I and a portion of recirculation water pipe line in Cooling water pumps of stage I