Loading
Loading…
Loading…
6,017 results • Latest
SUPPLY OF HYDRO CHLORIC ACID
Supply and erection of 150NB pipes for providing additional drain line from 0 mtr of IBD flash tank to trench near of CPU LH side with support arrangement in bottom side of pipes to reduce the water draining time from boiler
Overhauling and Replacement of mill seal air fan internals worn out damaged bearings and isolation gate damper of Seal air fans A B during AOH 2025
Damaged Air Water Separator vessels
Fabrication and Erection of Drain pots with Drain valves in IAC
Overhauling of Secondary crusher in BAHS