Loading…
Loading…
6,046 results • Latest
Selection of Developer for Setting up of Grid Connected 15 MWSolar PV Power Project and 15 MW/ 45 MWh BESS ArrangementinThiruvarur District, Tamil Nadu
MTPS-I ES Circle CI FSSS 12- Annual overhauling of retractor assembly of HEA ignitors, flame scanners Pr. Gauges switches, DP switches, Temp gauges switches, Transmitters, SADC positioners, HAG solinoid valves etc in Unit-I for the year 2026-27
Selection of Developer for Setting up of Grid Connected 15 MWSolar PV Power Project and 15 MW/ 45 MWh BESS Arrangement in Karur district.
MTPS-I ES Circle CI FSSS Pneumatic actuators Replacing of Existing copper tubes by SS tubes in UnitI to IV Boiler side instruments
Manufacture and supply of 39,600 Nos. of 8.00m (WL-200kg) PSC poles (REC Design) cast in twin mould form boxes in the Eastern side platform at M.G.Pudur PSC Yard for a period of three years
Selection of BESS Developers for Setting up of 7 Nos. of Standalone BESS of cumulative capacity of 1500 MWh (375 MW x 4 hrs) with complete 1.5 cycle charging/ discharging per day in Tamil Nadu for on Demand usage under TBCB under VGF Scheme.