Loading…
Loading…
47 results • Latest
Providing bore well, Motor pump set , construction of Water Sump, and Hand railing for Control House etc works at existing 132/33KV Switching Sub-station , Beechiganiapalli in Sri Satya Sai District
Replacement of age old porcelain disc insulators at all tension towers(120KN) with new SRC insulators in 220KV Podili-Markapur DC line (Previously known as 220KV Podili-Markapur-Srisailam DC line ) from loc no.79/10 to 79/01and 79 to 196 of EHT lines sub division/Ongole in Prakasam district under RMI 2025-26 Scheme.
Supply of 220kV CTs Ratio: 1600-800-500/1A, 5C (Creepage-31mm/kV)
Procurement of High Voltage Tester (150kV/100mA) for testing of Hotline tools
Erection of new 38KV, 7.2MVAR Capacitor Bank bay & associated equipment at 132/33 KV SS Lingasamudram in Prakasam District under RMI 2024-25 Scheme.
a. Replacement of badly damaged MS pipe line with new GI pipe line from pump house to 33KV bay and at locations near PGCIL-1&2 bays,khammam,Asupaka line raector, bus reactors b. servicing of all pumps, motors and deisel engine in pump house to arrest oil leakages including panel servicing and automation c. Replacement of existing damaged 65mm dia MS pylon support pipes around equipment d.Other miscellaneous works necessary to restore and maintain Mulsifyre in auto at 400KV Kalapaka SS
Construction of RCC retaining wall for location No.37 of SAE type (A+0) of 220KV SS Pendurthy - Maradam DC line in Visakhapatnam Dt
Procurement of 220kV, 132kV & 33kV Solid Core Insulators
Conversion of 132KV Bus from Single Moose to Twin Moose duly dismantling the existing Single Moose conductor at 132/33KV Sub-Station Autonagar
Painting of MS towers bearing Location Numbers 01 to 25 excluding towers from Loc No 12 to 14 (22 Towers) in 132 KV Chittoor N G Palli DC line in Chittoor District