Loading…
Loading…
8 results • Latest
Repairing of column , beam and foundation by extra Reinforcement and concreating, Flooring, Roofing by concreating and Plastering, painting ,steel works etc. within the jurisdiction of DWS Sub Division No.I, Collegetilla
Repairing and Mtc. of existing D.I.HDPE and PVC pipeline within the jurisdiction of 6.40 MLD GWTP Matripally 4.80 MLD GWTP Dinadayal and 4.0 M.G.SWTP at Bardowali and Mtc. of domestic water supply connection etc. under DWS SubDivision-II, MilanSangha
Supplying and installation of 610 m3 Hr (1.35 lakh)x 35 mtr. Head water lubricated turbine pump sets of JYOTI KIRLOSKAR WPIL GRW or equivalent make of raw water for 4.0 MGD SWTP Bordowali under DWS Sub Division No II, Milansangha, Agartala
Laying of additional rising line from Dinadayal Plant to Gajaria OHT and Over flow arrangement at Camper Bajar OHT, AD Nagar OHT and TAP OHT under DWS Sub Division No II, Milansangha, Agartala
Fittingfixingof electricequipin electricpanelboard andsparepartsfor submersible motor starter and main switch including copper cable for submersible pump in different DTW scheme along with 15.02MLD GWTP (Behind Raj Bhawan)4.57 MLD GWTP (Barjala)SDIII
Shifting of Water supply line of (G 7) building underground water tank Providing new DI line including Dismantled of RCC and other allied works (Deposit Work).