Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 7TH FLOOR 7B GODREJ ONE BUILDING PIROJSHANAGAR EASTERN EXPRESS HIGHWAY VIKHROLI E MUMBAI MAHARASHTRA 400079 | MUMBAI SUBURBAN | MAHARASHTRA | 400079 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical N 65 MIDC HINGNA INDUSTRIAL AREA HINGNA NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹24.3 Cr
EMD Value
₹48.6 L
Closing Date
17 Jul 2026, 3:00 pmClosed
Executive Engineer, TJB
Office of the Chief Executive Officer, Tripura Jal Board, 2nd Floor, UD Bhawan
Augmentation of Water Supply Management System using real time data monitoring SCADA Technology within Agartala City.
2026_TJB_73592_1
10/CE/TJB/2026-27
Open Tender
Civil Works
Item Rate
Agartala MC area
Please refer Tender documents.
9 documents required · 9 mandatory
₹20,000
₹48.6 L
Chamber of the Executive Engineer, TJB
17 Jul 2026
9 Jun 2026
17 Jul 2026
9 Jun 2026
17 Jul 2026
10 Jun 2026
10 Jun 2026 - 17 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, Installation, Trial Run and successful Commissioning of Instrumentation and SCADA System. | |||||
| 1.01 | 3 MGD SWTP at Collegetilla | - | Job | - | - |
| 1.02 | 11.2 MLD GWTP at Rampur | - | Job | - | - |
| 1.03 | 4 MGD SWTP at Bordowali | - | Job | - | - |
| 1.04 | 6.4 MLD GWTP at Matripalli | - | Job | - | - |
| 1.05 | 4.8 MLD GWTP at Sadhutilla | - | Job | - | - |
| 1.06 | 15.02 MLD GWTP at Raj Bhavan | - | Job | - | - |
| 2Providing Comprehensive Operation and Maintenance of Instrumentation and SCADA systems for 6nos. WTPs (Including Intakes, WT and OHRS, 76 locations) for 5 (Five) years by providing skilled manpower, Measuring Equipment, tools & tackles, replacement spare parts, renewal of software licenses, and internet data charges Spares required to keep the installation in running condition with minimum down time as per direction of Engineer-In-Charge. (During O & M period the agency is liable to change or replace all defective parts of the above unit by keeping rolling spares of each items in their own stock and replacement to be done within reasonable time. Necessary annual onsite calibration/verification of all the field instruments to be done regularly. Service activities for software/ SCADA/ PLC to be done regularly. No extra cost shall be entertained by the department). | |||||
| 2.01 | 6 Nos WTP'S + Central Scada Facility (1st Year) | - | Job | 100 | - |
| 2.02 | 6 Nos WTP'S + Central Scada Facility (2nd Year) | - | Job | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.03 MB
Tendernotice_2.pdf
PDF • 4.16 MB
BOQ_74898.xls
BOQ • 0.40 MB
CorrigendumSCADA.pdf
PDF • 0.10 MB
CorrigendumSCADA1.pdf
PDF • 0.89 MB
CORRIGENDUMSCADA25062026.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .