Loading…
Loading…
867 live702 closing this weekmost from Director Agriculture and Chief Engineer, PWD (R and B)
867 results • Latest
Construction of CC road from Ramnagar PWD road to Kishore Debbarma house of Ramnagar VC under Chalrilam RD Block, Sepahijala District, Tripura during the financial year 2026-27. (PWD SoR 2023).
Construction of Advocates Interview room adjacent to prisoners interview room at Kendriya Sansodhanagar, Bishalgarh, under RD Bishramganj Division, Sepahijala District during the year 2026-27. (PWD SoR 2023).
Construction of CC road from Ramnagar PWD road to Kishore Debbarma house of Ramnagar VC under Chalrilam RD Block, Sepahijala District, Tripura during the financial year 2026-27. (PWD SoR 2023).
Construction of Manubazar Police Station Building at old Manubazar P.S Complex, Manubazar Sabroom, South Tripura / SH - Building portion including underground water tank, internal water supply and sanitary installation etc.
construction of 3nos RCC drain and slab at ward no 20 under Dharmanagar Municipal Council for the year 2026 2027 Gr 1
Proposed construction of 100 seated girls hostel building in Vidyajyoti Schools attached to Amtali HS School under Dukli Block under central financial assistance under NESIDS from MODONER Providing IE works including outdoor illumination thereof
Supplying installation testing and commissioning of 12 Volt 160AH SMF VRLA Battery for Two nos 125 KVA UPS at CM Bungalow Shyama Prasad Mukherjee Lane Agartala West Tripura
Repair and maintenance of Barrack being used by CH staff at campus Salbagan under FTR HQ BSF Tripura SH EI Fans
Infrastructure Development of Sepahijala HS School Sepahijala District Tripura sanctioned under RIDFXXIX SH Building portion including internal water supply sanitary installation sewage and drainage works Providing internal electrification thereof
Special repairs to IE works for the Office of the Sub-Divisional Magistrate Sadar West Tripura
Construction of internal roads of Raj-Rajeswari Temple by interlocking paver block and other allied works during the year 2026-27.
Hiring of 1 (one) no Mahindra Scorpio incl. fuel and driver for use by the Superintending Engineer, RD 6th Circle, Khowai, Tripura.
Repair and Maintenance of barrack (Being used by CH staff) at campus Salbagan under FTR HQ BSF Tripura
INSTALLATION OF WESTERN COMODE
R/Mtc of Various WSS undr MTB/ SH- Mtc of pipe line, electrcl equipmnt, provdng drnkng wtr faclty at various GP/VC wthn MTB under DWS SD No.- II during the financial year 2026-27.
Complete operation, Maintenance, upkeepment in/c watch ward of 0.3 MGD SWTP at Dasda of Uttar Dasda vc under DWS Sub-Division Dasda.
Development of road from Bhabanipur Bazar to Manuartilla(L2.80 Km)SH Construction of RCC Cover Drain at Bhabanipur Bazar
Mtc. of Residential buildings at Ambassa PWD Quarter Complex/ SH-Mtc. of PWD Staff quarters no. T-II- 31, T-I-06 and 07, at Ambassa under Ambassa Division, PWD (RandB).
Hiring of 1(one) no Maruti ECO/Maruti Wagnor R (Petrol) having commercialRegistration (Manufacetured not before 2024)for the office of The Assistant Engineer,DWS Sub- Division Kanchanpur,North Tripura during the year 2026 27.(2nd Call)
SH Patch WBM Grouting Recarpeting Brass Seal coat and allied works
SH Construction of RCC Box Culvert at ch. 0.450Km RCC Pucca drain Pucca Drain (CC) Patch Metaling Patch Carpeting with Sand seal coat and other allied works etc
Providing and applying of Bleaching powder Hydrated lime for production of quality treated water as per guideline of WHO/BIS under DWS Sub Division Dasda.
MAINTENANCE WORK
of Melaghar PWD (RandB) Sub Division during the FY 2026 27 SH Patch WBM Grouting Recarpeting and allied works
SH Patch WBM Grouting Recarpeting and allied works
Regular cleaning and washing of inside and outside of plant area including cleaning of clariflocculator sludge water storage tank clear water reservoir and OHT under TJB Sub Division II Milansangha Agartala for 01 one year
Jungle clearence, Patch Repairing,GSB,WBM-II,WBM-III, Carpeting,R.C.C Retaining wall,CD, R.C.C Drain , Road Marking etc Complete from Ch 0.00 km to 2.488 Km
Development of road from Manaipathar to Thalibari via Kalacherra(L6.00 Km) SH Maintenance of existing Box Cell Bottom slab Wing wall and Cutoff wall (At Ch. 0.5 1.8 and 3.7 Km)
Development of road from Kathalia to Indhuria via Naldepa (L 8.20 Km) SH Construction of RCC Retaining Wall at Kathalia to Indhuria via Naldepa at Ch. 2.98 Km 3.50 Km and 3.80 Km
WBM-3, Carpeting,CD,R.C.C Drain,Road Marking etc Complete from ch 0.00 km to ch 3.0km.
Jungle clearence,GSB,WBM-II,WBM-3, Carpeting,Retaining wall,CD,R.C.C Drain,Road Marking etc Complete from ch 0.00 km to 1.20 km
Major Works SH Construction of 15000 Gallon RCC reservoir with pump house installation of pump motor sets electrical accessories and allied works at Banarai Para under Magroom VC Rupaichari RD Block DWS Sub Division RPC South Tripura FY 26 27
Sinking of 1(one) no Small Bore Deep Tube Well along with pump set and other electrical accessories under ward no.33 AMC South zone area under TJB Sub-Division II Milansangha Agartala
Construction of RCC protection wall drain and flooring of pump house at Adarshapara DTW scheme under TJB Sub Division II Milansangha
Sand filling Brick solling repairs potholes carpeting Providing interlocking blocks concreting etc after completion of different TJB pipeline works under TJB Sub-Division No II Milansangha Agartala
RETAINING WALL
Periodical cleaning of intake well/Jack well for smooth running of diferent surface water Treatment plants and Innovative Schemes under DWS Sub-Division Dasda during the year 2026-27
R Mtc of RWS Schemes Rewinding of submersible motors and repair of pumps including lifting and lowering of pump motor sets at DTW schemes under Jalefa Betaga Sector Satchand RD Block DWS Sub Division Sabroom FY 2026 27 GR I
Hiring of 1(one) no Maruti ECO/Maruti Wagnor R (Petrol) having commercial Registration (Manufacetured not before 2024)for the office of The Assistant Engineer,DWS Sub-Division Dasda,North Tripura during the year 2026-27
WBM-3, Carpeting,Retaining wall,CD,Road Marking,RCC drain etc. Complete.from ch 0.00 km to 1.50 km (Group-1)
Development of road from Sonamura Boxanagar to Sonamura Boxanagar road (Dayalpara) (L-0.416 Km) SH Pucca Drain GSB WBM 3 Paver Block and other allied works portion from Ch. 0.251 Km to Ch. 0.416 Km
Replacement of old unserviceable motor of different Deep Tube Well under the jurisdiction of TJB Sub-Division II Milansangha Agartala
Jungle clearance, GSB, WBM-II, WBM-3, Carpeting, Retaining wall, CD, Road Marking, etc. Complete.from ch 0.00km to 1.50km (Group-I)
R.C.C double cell box culvert, Brick soling, WBM-3, carpeting,etc complete
Development of Road from Sonamura-Boxagnagar road to Jumertila (L-0.250 Km) SH Pucca Drain WBM 3 Paver Block and other allied works portion from Ch. 0.00 Km to Ch. 0.130 Km
Development of road from Sonamura-Boxanagar to Sonamura Boxanagar road (Dayalpara) (L-0.416 Km) SH Pucca Drain GSB WBM 3 Paver Block and other allied works portion from Ch. 0.00 Km to Ch. 0.166 Km
Running Mtc. and smooth running of Surface Water Treatment Plant 0.65 MGD at Kumarghat SH Providing and applying of Alumina Ferric grade-4, lime, and Bleaching Powder for SWTP kumarghat under DWS Sub-Division Kumarghat during the year 2026-27
Hiring of vehicle for Office of the Assistant Engineer, DWS Sub- Division, Kumarghat, Unakoti Tripura (Type of commercial vehicle Maruti Wagon-R_Maruti Eeco) model not before 2024
Development of Road from Sonamura Boxagnagar road to Jumertila (L-0.250 Km) SH Pucca Drain WBM 3 Paver Block Retaining Wall and other allied works portion from Ch. 0.130 Km to Ch. 0.250 Km