Loading…
Loading…
29 live24 closing this weekmost from Director (Urban Development Department) and Chief Engineer, PWD (R and B)
29 results • Best match
Improvement of Roads and Storm Water Drainage System in Bishalgarh Sonamura Santirbazar Sabroom Cluster IVA Towns of Tripura
Construction of CC gali road and pucca drain with covered slab starting from H.O Babul Chowhan to H.O Ajit Das at Thakurpalli, under ward no.06, AMC
Development of Road from Rahimpur Putia (ONGC Drill 1) to Rukhia (L-1.14 Km) SH Pucca drain Box Cell Metalling Carpeting Seal coat Protection work and other allied works
Construction of drain from Lankamura Harendra Sarkar Shop to H/O Pradip Sarkar, under ward no. 01, AMC, 3rd call
Boxcell pucca drain Protection Wall and other allied works
Construction of a. CC road pucca drain and retaining wall starting from H.O Pradip Rudra Pal to H.O Madhu Rudra Pal at Palpara b. CC road starting from H.O Dayal Rudra Pal to H.O Subhal Rudrapaul at Palpara, under ward no.06, AMC
Construction of English Medium College at Old Central Jail Premises, Agartala, Tripura, during the year 2026-27 SH Balance Portion Building portion including internal water supply, sanitary installation, sewage and Drainage works. 2nd Call
construction of RCC drain at ward no 01 to12 within DMC area during the year 2024 25 2nd call
Construction of RCC cover drain near Badarsaheb Bari under ward no 08 UMC UDP 2026 27 Total length 22.90 m.
Construction of R C C Drain with slab at ward no 25 within DMC area during the year 20252026 2nd Call.
Construction of RCC drain with cover slab at different locations under ward No 06 UMC UDP 2026 27. TL 150.45 m.
Construction of masonry drain including cover slab and Paver Block Road at Rani Rashmani Road from the DM Quarters to Atal Bhaban at Ward No 10 under UMC UDP 2026 27 Total Length of drain Right Side 203.00 m and Left Side 250.00 m. Total Length of th
Construction of R C C Drain and C.C Pavement Road at ward no 01 within DMC area During the year 2025 2026 2nd Call.
Construction of R C C Drain and CC Pavement Road at ward no 06 within DMC area During the year 2025 2026 2nd Call.
Construction of RCC cover drain from Samirlal Choudhury house to Kamala Charra at ward no -01, under Ambassa Municipal Council during the year 2026-2027
Construction of R C C Drain with slab and C C Pavement Road at ward no 05 within DMC area during the year 2025 2026 2nd Call.
Development of road from Krishnanagar BSF camp to Kalkalia (L-1.50 Km) during the year 2026-27/ SH Grouting, Carpeting, Tack coat, seal Coat, surface drain etc
Construction of cc road and drain slab st from the HO Nepal Sarkar to HO Pallab Biswas at the road South Chandrapur under ward no 25 AMC2nd call
Construction of R C C Drain and RCC Retaining Wall Back Side of Dharmanagar Kali Bari Ward No 15 Within D M C area during the year 2025 2026
Construction of Sewerage RCC drain including slab from Rabindra Datta house to Babul Debnath house at ward-08 under Ambassa Municipal council during the year 2026-2027.L-210 mtr
Development of Agartala town road during the year 2026-27 SH Development and construction of RCC drain at Ichamua, including grouting at various road of ward no-09. 2Nd Call
Construction of New Boundary in front of Children Park and Fishery Training Centre and R C C Drain in front of Children Park within D M C area During the year 2024 2025.
Construction of RCC Drain including paver block road from Garage of Prasanta Saha to NH 8 at near Brahmabari Ward No 10 Under Udaipur Municipal Council during the year 2025 26. Total length 134.90 m.
Construction of RCC Drain including paver block road from Garage of Prasanta Saha to NH 8 at near Brahmabari Ward No 10 Under Udaipur Municipal Council during the year 2025 26. Total length 134.90 m.
Development of road from Ranir Bazaar Durganagar High School to Rajchantai under Mandwi Sub-Division during the year 2026-27 (Length 5.395 Km) SH Patch Grouting , Patch Carpeting, Construction of surface drain etc. and other allied works.
Pothholes repair, Re-carpeting, tack coat, Seal coat, surface drain etc.
SH CC work Paver block Brick work Drain and other allied works
Strengthening of Udaipur-Sabroom section from km 55.000 to km 127.372 of NH-08 and Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode
Patch Soling, WBM, BM, carpeting, RCC Drain etc at Central Store A.D.Nagar, Agartala und er AMC Ward No.46.