Loading…
Loading…
14 live9 closing this weekmost from National Highways and Infrastructure Development Corporation and Director (Urban Development Department)
14 results • Best match
Strengthening of Udaipur-Sabroom section from km 55.000 to km 127.372 of NH-08 and Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode
Development of road from NH-208 to bamancherra-Mahabir road (L 0.60Km).
Construction of A Site Retail Outlet on NH 8 within 4 KM from Bagma Sub Health Centre towards Bishramganj Dist Gomati Tripura under Silchar DO of IndianOil AOD state office
Restoration works under Specialized Repairs through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, base
Maintenance Repair work on Champaknagar to Khayerpur road section on NH-08 from Km 242.500 to Km 261.610 (existing road) at various sections at the risk and cost of EPC Contractor in the state of Tripura in the FY 2026-27 on item rate basis work
Construction of CC road including toe wall from NH-08 to Narmada house at ward-09, under Ambassa Municipal Council during the year 2026-2027
Construction of RCC Drain including paver block road from Garage of Prasanta Saha to NH 8 at near Brahmabari Ward No 10 Under Udaipur Municipal Council during the year 2025 26. Total length 134.90 m.
Construction of RCC Drain including paver block road from Garage of Prasanta Saha to NH 8 at near Brahmabari Ward No 10 Under Udaipur Municipal Council during the year 2025 26. Total length 134.90 m.
Restoration works at risk and cost of EPC Contractor through STMC in Tripura during FY 2026 27 on percentage rate and work order for the following road stretches Kaila Khw Pkg I Kaila Khw Pkg IV Kaila Khw Pkg V Agar Khw Pkg II
Supply Installation Testing Commissioning Operation and Maintenance of Centralized Control and Monitoring System (CCMS) for Street Lighting on NH under NHIDCL RO Agartala on Five (05) Year Contract Basis
Flat Brick soling, Repair to pot holes, WBM-II, III, Re-carpeting, Seal coat etc
SR, ER work and road safety measures through STMC on NH-08 between old Ch 318 Panitila to old Ch 343 East Kanchanbari total length 21.94 km in Tripura in FY 2026-27 on percentage basis and work order basis
RR work on NH 208 from km 36 to km 72 at various locations of existing road of Rangamati to Patichhari road section Pkg III at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate and work order basis
R and R work on NH 208 from km 0 to Km 36 at various locations of existing road of Khowai - Harina section Pkg II at risk and cost of EPC Contractor in Tripura in FY 2026 27 on item rate basis and work order basis